The Process

We are very early in this process but there is a sequence of events that has to happen before we can break ground and build our (and hopefully your dream).
We have already had meetings with City of Kimberley, Kimberley Chamber of Commerce, Kimberley Rotary Club.  There is still work to do before obtaining letters of support on the concept of a spray park but all the above believe that this is a positive concept for our community.


The steps we must now take are as follows:
Step 1 - Permits, health department and bylaw requirements, components, theme and water supply choices are considered.
Step 2 - Final component selection submitted.
Step 3 - Submission of site drawings with services identified and grading plan.
Step 4 - Proposed design drawn up, including concept layout, conceptual pad layout, component placement with dimensions and a piping plan.
Step 5 - Complete construction drawings and engineer-stamped spray park grading plan.
Step 6 - Final design approval.  Deposit submitted.  Colours and graphics submitted.
Step 7 - Contractor provided with anchor hardware
Step 8 - Footing installed and site prepared.
Step 9 - Mechanical workbook prepared for water consumption and sequencing.
Step 10 - Components manufactured.
Step 11 - Outstanding balance paid and components shipped.
Step 12 - Components received and installation begins.
Step 13 - Grand opening.


All through the initial stages we will be fund raising.  A donation site will be created on this site.